Bredabaan - Merksem
 
 
Activities
Civil Engineering
Railway infrastructure & stations
Road construction
General roadworks
Asphalt works
Concrete works
 
Contractor
Willemen Infra
 
Executed works
Reconstruction of Bredabaan and Burgemeester Jozef Nolfplein
 
Location 
Bredabaan, Merksem, Antwerpen, Belgium
 
Client
Agentschap Wegen en Verkeer Antwerpen
 
Price
€17.000.000
 
Engineering Office
Tractebel
 
Construction period 
2 years 3 months
 
Start work 
05-2013
 
End of work 
08-2015
 

Bredabaan in Merksem was reconstructed from Minister Delbekelaan to Molenlei in 2013. Bredabaan is now a pedestrian shopping street with 2 vehicle lanes, bicycle paths and footpaths, a new tram infrastructure, parking strips and a new Burgemeester Jozef Nolfplein.
Aannemingen Van Wellen not only took care of the construction of a tramway in reinforced concrete, a vehicle lane in 3-layer asphalt, a bicycle path in red asphalt and a footpath in granite tiles, it also carried out the drainage works. The works involved thrust boring in long sections and trench shoring using secant piles. The construction of a tram track with a pre-assembled rail system was another challenge that we were able to rise to at Aannemingen Van Wellen.
 

Willemen Infra

Booiebos 4
9031 Drongen (Belgium)
tel + 32 9 282 60 30
infra@willemeninfra.be
website

Willemen Infra came into being on 1 July 2018 as a result of the merger between Aswebo, Aannemingen Van Wellen and the infrastructure department of Kumpen and is a leading road builder and asphalt and concrete manufacturer.
     © Willemen Groep