PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Pont de Luttre - Luttre
 

Project Details


Activities
Civil Engineering
Bridges

Contractors
Franki

location
6238 Luttre
Belgium
Hainaut BE

Client
SPW Direction des voies hydrauliques de Namur et Charleroi

Price
€2.500.000

Span
84m

Construction period 
2 years 5 months

Start work 
01-2016

End of work 
06-2018


 

Replacement of the 'Pont de Luttre' over the canal Charleroi-Brussels.

Our assignment included:

  • Various preparatory works;
  • The local relocation of towpaths on both banks of the canal (for the construction of the new intermediate piers);
  • The construction of two new abutments and two new intermediate piers;
  • The construction of a new bridge deck;
  • The construction of new roads connecting to the new bridge, including the construction of new connections to the various public and private entrances;
  • The demolition of the existing bridge and the roads connecting to the existing bridge;
  • The construction of new accesses to the towpath on the banks of Pont-à-Celles (pedestrian stairs + cycle path);
  • The development of the surrounding area and equipment of the structures.
Franki

Chemin des moissons, 10
4400 Flémalle, Liege (Belgium)
tel +32 4 2505150 | +32 4 3493939
info@franki.be
www.franki.be

Since 1998 Franki has been part of Willemen Groep, the largest family construction group in Belgium.