Administrative centre - Seraing

Description 

Thanks to the adoption of an overall design approach, in close coordination with the Greisch architectural consultancy and the City of Seraing, the new Seraing Administrative Centre is the first office building of this size in the Walloon Region to meet the challenge of passive building criteria, in terms of both heating and cooling.

  • Building surface: 6, 000 m²
  • Surrounds: 5,650 m²
  • Earthworks: 5,900 m³
  • Concrete cast in situ: 3,830 m³
  • Flooring slabs: 5,350 m².

Since 1998 Franki has been part of Willemen Groep, the largest family construction group in Belgium.

 
location 

Project Details

Contractor
Features 
"Passive" type building
Place Kuborn 5, Seraing, Liege, Belgium
Client 
Ville de Seraing
End User 
Administration de Seraing
Architects 
Bureau d'Architecture Greisch
Engineering Office 
Neo & Ides
Construction period
1 year 3 months
Start work
01-2012
End of work
04-2013