PROJECT PDF
 
 
 
Willemen Groep
Boerenkrijgstraat 133, BE - 2800 Mechelen
tel +32 15 569 965, groep@willemen.be
 
Data centre campus CyrusOne - Amsterdam (The Netherlands)
 

Project Details


Activities
Buildings
Industrial & logistics
International

Contractors
Willemen Construct

location
Polanenpark
2031 BP Haarlem
Netherlands
Noord Holland NL

Client
CyrusOne

Architects
Hyphen
Knevel Architecten

Engineering Office
Pinnacle

Surface area above ground
27 000m²

Special features

Construction period 
9 months

Start work 
12-2018

End of work 
09-2019


 

Realisation of the closed shell of the new campus for US data centre operator CyrusOne with a capacity of 72 megawatts. The structure consists of 3,500 tonnes of steel and 4,000 m³ of concrete and is founded on 3,500 foundation piles.

 

Willemen Construct

Boerenkrijgstraat 133
2800 Mechelen, Antwerpen (Belgium)
tel +32 15 56 99 65
bouw@willemen.be
www.willemen.be

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.