Labo building BASF - Antwerp
 

Project Details


Activities
Buildings
Industrial & logistics

Contractors
Willemen Construct

location
Scheldelaan 600
2040 Antwerpen
Belgium
Antwerpen BE

Client
BASF Antwerpen

Special features

Construction period 
1 year 5 months

Start work 
01-2019

End of work 
06-2020


 

Franki Construct has built a new laboratory in the port of Antwerp on the BASF site, which is the largest chemical production centre in Belgium.

The building measures 61 m x 35 m and is 16 m high. The ground floor and first floor are made from concrete. Columns, beams, arches and concrete façade panels are used on the ground floor. The “technical floor” is a steel construction, and the first and second floors have metal cladding. The laboratory is equipped with a green roof.

 

Willemen Construct

Boerenkrijgstraat 133
2800 Mechelen, Antwerpen (Belgium)
tel +32 15 56 99 65
bouw@willemen.be
www.willemen.be

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.