Special features

Construction period 
1 year 5 months

Start work 
01-2019

End of work 
06-2020


 

Franki Construct has built a new laboratory in the port of Antwerp on the BASF site, which is the largest chemical production centre in Belgium.

The building measures 61 m x 35 m and is 16 m high. The ground floor and first floor are made from concrete. Columns, beams, arches and concrete façade panels are used on the ground floor. The “technical floor” is a steel construction, and the first and second floors have metal cladding. The laboratory is equipped with a green roof.

 

Willemen Bouw

Boerenkrijgstraat 133
2800 Mechelen, Antwerpen (Belgium)
tel +32 3 450 77 00
bouw@willemen.be
www.willemen.be

Willemen Bouw was established on 30 April 2025 through the merger of Willemen Construct, Cosimco, Franki Construct and Tools.