Central Radiochemical Facility - Mol

Description 

At the SCK site in Mol, Franki Construct is building a new production facility for medical radioisotopes. The CRF building will consist of two zones:

  • A controlled zone with a number of clean rooms for isotope production, areas for packaging the products and waste management, and radiological laboratory areas for checks and preparations.
  • A zone with office spaces, a meeting room, a chemical laboratory space for preparations and sanitary facilities.

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.

 
location 

Project Details

Contractor
Boerentang 200, Mol, Antwerpen, Belgium
Client 
SCK CEN Stichting Openbaar Nut
Architects 
Arteum Architects
Engineering Office 
Sweco Belgium (stabiliteit)
Construction period
10 months
Start work
03-2023
End of work
01-2024