Since 1998 Franki Construct has been part of Willemen Groep, the largest family construction group in Belgium.

Motorway A11 Bruges-Westkapelle
22 March 2014, Agentschap Wegen enVerkeer (...

New ring road...
The project consists of the construction of...
Ecoduct Kempengrens - Mol
Description
Franki Construct built the ‘Kempengrens’ ecoduct [wildlife crossing] at the hamlet of Postel, in the municipality of Mol, which is near the Belgian-Dutch border. It is a bridge structure over the E34 that allows local fauna to get over the motorway in safety. The project is a collaboration between the Flemish and Dutch governments and aimed at reducing the negative impact on the local ecosystem caused by the man-made road infrastructure. The specific design and location of the bridge ensures maximum integration within the natural surroundings.
The minimum width of the ecoduct is 60 metres and it features a special diabolo-like design that continues on into the land abutments. The walls are arched and refer to the twisting movement of snakes, being one of the animal types that will make frequent use of the ecoduct. The bridge is constructed from reinforced, high-strength concrete (C40/50) and the land abutments from traditional, strong concrete (C35/40). The abutments have been conceived as a hollow volume, instead of a single, thick wall. The rounded shapes of the bridge, the hollow cavities in the abutments and the oval-shape of the central pillars demanded a specific type of shuttering. This ecoduct is certainly not a standard bridge. Throughout the period of the construction work it was essential that the E34 motorway remained open in the direction of Antwerp and Eindhoven with respectively two and one lanes.
The minimum width of the ecoduct is 60 metres and it features a special diabolo-like design that continues on into the land abutments. The walls are arched and refer to the twisting movement of snakes, being one of the animal types that will make frequent use of the ecoduct. The bridge is constructed from reinforced, high-strength concrete (C40/50) and the land abutments from traditional, strong concrete (C35/40). The abutments have been conceived as a hollow volume, instead of a single, thick wall. The rounded shapes of the bridge, the hollow cavities in the abutments and the oval-shape of the central pillars demanded a specific type of shuttering. This ecoduct is certainly not a standard bridge. Throughout the period of the construction work it was essential that the E34 motorway remained open in the direction of Antwerp and Eindhoven with respectively two and one lanes.
Â
Some key figures:
- 32,000 m special fencing for fauna
- 15,000 m³ concrete
- 1,325,000 kg reinforcements
- 6,900 m pre-stressing (pipes)
- 90,000 m³ earth fill.
Â
News
07/07/2014 - 11:15
location
Project Details
Contractor
E34 kilometerpaal 57.8, Mol, Antwerpen, Belgium
Client
Agentschap Natuur en Bos, Agentschap Wegen en Verkeer, Provincie Noord Brabant Nederland
Architects
Agentschap Wegen en Verkeer
Afdeling expertise beton en staal
Engineering Office
Agentschap Wegen en Verkeer, afdeling expertise beton en staal
Span
68m
Surface area above ground
4 250m²
Surface area subterranean
2 870m²
Construction period
11 months
Start work
08-2013
End of work
07-2014