Elisabeth Center - Antwerp

Prev Next
Description 

Who does not know Antwerp's Koningin Elisabeth Hall? Big stars like Bruce Springsteen and Jacques Brel performed here. Willemen starts work in June 2014 on a new top hall of international standing on the same site. The ensemble is also being renamed to become the Elisabeth Center Antwerp.

The Elizabeth Center Antwerp, near the Central Station, is being equipped with the latest facilities and technical equipment. The new concert and congress hall is part of a fully-fledged complex with ultra-modern facilities and can be combined with the existing halls of the ZOO and the zoo itself. The hall will seat between 1,825 and 2,000 guests. Two large auditoria will be added to the congress centre, one of 550 m² on the ground floor and a second of 450 m² on the first floor.

This will make the Elizabeth Center Antwerp the ideal setting for classical music. But rock, pop, world music and musicals will also have their place in the new hall. National and international conferences will be able to welcome their participants in a high quality, contemporary setting. The Elizabeth Center Antwerp will also become the home base for the Royal Flemish Philharmonic, ‘deFilharmonie’.

The design is by British architect Ian Simpson in collaboration with Kirkegaard Associates of Chicago (a world authority in the field of acoustics), and engineering consultancy Bureau Bouwtechniek in Antwerp. THV (temporary joint venture) Elisabeth is responsible for the construction and finishing of the project. This temporary joint venture consists of Willemen General Contractor, Heijmans nv and Verstraete & Vanhecke. The building is being built to the latest sustainability and environmental standards.

Some figures:

The complex covers some 25,000 m²
the Koningin Elisabeth Hall has 2,000 seats
three tower cranes are being used
the building rests on 500 piles
the construction work will last 820 calendar days
1,300 tons of reinforcing steel and 800 tons of profiled steel will go into the building
there will be 17,600 m² of infill-block roofing/flooring
the heaviest truss weighs 35 tons
the complex will contain 17 lifts
the stage consists of 12 individually movable parts.
 

Willemen Construct came into being on 1 July 2018 as a result of the merger between Willemen General Contractor and the construction department of Kumpen.

 
location 

Project Details

Contractor
Executed works 
New construction and renovation of a concert hall (current Kon. Elisabeth Hall) with congress centre
Koninging Astridplein 26, Antwerpen, Antwerpen, Belgium
Client 
KMDA Departement Projecten
Price 
€49.000.000
Architects 
Ian Simpson Architects
Kirkegaard Associates
Bureau Bouwtechniek
Temporary partnership 
Willemen, Heijmans, Verstraete Vanhecke
Surface area above ground 
25 000m²
Construction period
2 years 5 months
Start work
06-2014
End of work
11-2016